First place your drip edge on the rake edge.
Metal roof installation rake or drip edge first.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Drip edge is a thin metal flashing that is applied to the edges of your roof underneath the shingles.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Along your angled line make a mark 1 down from the top.
Get the real story about drip edge placement.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Underlayment along the eaves will overlap the top of the drip edge.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Install sheet metal drip cap over the lower rim.
Connect the mark to your 1 top side mark.
Mark where the drip edge begins to overhang and one inch further out from that overhang.
Cut the entire drip edge by your second mark so that it only hangs past the edge by an inch.
The main purpose of the drip edge is to direct the flow of water away from the fascia board and to help protect the rakes and eaves of your roof.
Using t bevel which was previously locked to the pitch of your roof mark a line on the drip edge side of the gable up to the 3 mark.
The extension should be at least inch for it to work.
Space nails every 12 in.
Using your combo square mark a 45 degree line along the drip edge.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Does the drip edge metal go under the tarpaper ice and water shield or underlayment on the eave.
Along the rake edges of a roof install underlayment before applying drip edge.
This lets any water that gets on the roof run down the underlayment and over the drip edge.
As seen in m.